he great advantage of our location at Lübeck is the Trave river. This
waterway that leads to the Baltic Sea enables us to
assemble components and ship them safely to their destination by sea.
The Lübeck works has two quay cranes with capacity of 30 t and 80t,
a floating crane for a 200t is at our disposal.
The direct link to the
Autobahn to Hamburg (A1), its seaport on the river Elbe
and its airport gives us all the logistics we need to transport
complete structures or structural elements and spare parts to their
destination quickly and safely.
Several large assembly
shops ensure that work can proceed independent from the weather. Firmly
installed ceiling cranes inside the shops allow manufacturing and
assembly of heavy components. A further assembly yard is available
in the free space around the shop.
Some examples of the parts
manufactured and assembled at the Lübeck works can be found in the
menu under heading mechanical engineering. The following is only a
small selection: